U.S. Housing Starts

Privately owned housing units whose construction started during the month.

1,221.00

September 2026 · Published level
Thousands of housing units, annual rate · Seasonally adjusted

Compared with August 2026
-67.00 thousands of housing units, annual rate

Compared with September 2025
-98.00 thousands of housing units, annual rate

Source: Census / HUD
Publication date: 2026-10-20
Status: Revisable estimate
Site snapshot: 2026-10-22-30bf3753

Check the producer release for the next publication. Site updates follow source review.

Values come from the Census / HUD file acquired for reviewed edition 2026-10-22-30bf3753. Check freshness · See what changed.

Historical data

Housing starts · Published level · Thousands of housing units, annual rate · Seasonally adjusted

Housing starts — Thousands of housing units, annual rate 236.11,486.02,735.9 1960198020002020 Housing starts — Thousands of housing units, annual rate 236.11,486.02,735.9 1960198020002020

Shaded bands mark NBER-dated U.S. recessions within the displayed range.

September 2026: 1,221 Thousands of housing units, annual rate

813 periods. Unpublished values remain gaps; no interpolation is applied.

Accessible historical table
Housing starts: Published level, Thousands of housing units, annual rate
Reference periodValueStatus
September 20261,221Revisable estimate
August 20261,288Revisable estimate
July 20261,369Revisable estimate
June 20261,439Revisable estimate
May 20261,182Revisable estimate
April 20261,414Revisable estimate
March 20261,522Revisable estimate
February 20261,346Revisable estimate
January 20261,385Revisable estimate
December 20251,378Revisable estimate
November 20251,319Revisable estimate
October 20251,273Revisable estimate
September 20251,319Revisable estimate
August 20251,291Revisable estimate
July 20251,432Revisable estimate
June 20251,379Revisable estimate
May 20251,289Revisable estimate
April 20251,400Revisable estimate
March 20251,346Revisable estimate
February 20251,491Revisable estimate
January 20251,353Revisable estimate
December 20241,494Revisable estimate
November 20241,300Revisable estimate
October 20241,370Revisable estimate
September 20241,357Revisable estimate
August 20241,394Revisable estimate
July 20241,269Revisable estimate
June 20241,318Revisable estimate
May 20241,329Revisable estimate
April 20241,379Revisable estimate
March 20241,297Revisable estimate
February 20241,555Revisable estimate
January 20241,378Revisable estimate
December 20231,504Revisable estimate
November 20231,522Revisable estimate
October 20231,380Revisable estimate
September 20231,369Revisable estimate
August 20231,321Revisable estimate
July 20231,464Revisable estimate
June 20231,420Revisable estimate
May 20231,609Revisable estimate
April 20231,343Revisable estimate
March 20231,366Revisable estimate
February 20231,395Revisable estimate
January 20231,358Revisable estimate
December 20221,296Revisable estimate
November 20221,434Revisable estimate
October 20221,446Revisable estimate
September 20221,481Revisable estimate
August 20221,532Revisable estimate
July 20221,382Revisable estimate
June 20221,556Revisable estimate
May 20221,546Revisable estimate
April 20221,807Revisable estimate
March 20221,700Revisable estimate
February 20221,730Revisable estimate
January 20221,693Revisable estimate
December 20211,711Revisable estimate
November 20211,707Revisable estimate
October 20211,587Revisable estimate
September 20211,576Revisable estimate
August 20211,596Revisable estimate
July 20211,600Revisable estimate
June 20211,664Revisable estimate
May 20211,600Revisable estimate
April 20211,489Revisable estimate
March 20211,688Revisable estimate
February 20211,398Revisable estimate
January 20211,624Revisable estimate
December 20201,614Revisable estimate
November 20201,543Revisable estimate
October 20201,543Revisable estimate
September 20201,473Revisable estimate
August 20201,396Revisable estimate
July 20201,526Revisable estimate
June 20201,266Revisable estimate
May 20201,039Revisable estimate
April 2020936Revisable estimate
March 20201,266Revisable estimate
February 20201,549Revisable estimate
January 20201,581Revisable estimate
December 20191,548Revisable estimate
November 20191,353Revisable estimate
October 20191,325Revisable estimate
September 20191,311Revisable estimate
August 20191,375Revisable estimate
July 20191,240Revisable estimate
June 20191,243Revisable estimate
May 20191,293Revisable estimate
April 20191,272Revisable estimate
March 20191,191Revisable estimate
February 20191,121Revisable estimate
January 20191,226Revisable estimate
December 20181,095Revisable estimate
November 20181,181Revisable estimate
October 20181,221Revisable estimate
September 20181,250Revisable estimate
August 20181,288Revisable estimate
July 20181,208Revisable estimate
June 20181,192Revisable estimate
May 20181,357Revisable estimate
April 20181,276Revisable estimate
March 20181,318Revisable estimate
February 20181,277Revisable estimate
January 20181,299Revisable estimate
December 20171,177Revisable estimate
November 20171,273Revisable estimate
October 20171,257Revisable estimate
September 20171,181Revisable estimate
August 20171,159Revisable estimate
July 20171,206Revisable estimate
June 20171,249Revisable estimate
May 20171,157Revisable estimate
April 20171,146Revisable estimate
March 20171,190Revisable estimate
February 20171,271Revisable estimate
January 20171,190Revisable estimate
December 20161,252Revisable estimate
November 20161,140Revisable estimate
October 20161,313Revisable estimate
September 20161,068Revisable estimate
August 20161,171Revisable estimate
July 20161,239Revisable estimate
June 20161,203Revisable estimate
May 20161,148Revisable estimate
April 20161,163Revisable estimate
March 20161,111Revisable estimate
February 20161,225Revisable estimate
January 20161,092Revisable estimate
December 20151,146Revisable estimate
November 20151,172Revisable estimate
October 20151,058Revisable estimate
September 20151,224Revisable estimate
August 20151,130Revisable estimate
July 20151,146Revisable estimate
June 20151,205Revisable estimate
May 20151,079Revisable estimate
April 20151,190Revisable estimate
March 2015960Revisable estimate
February 2015886Revisable estimate
January 20151,085Revisable estimate
December 20141,073Revisable estimate
November 20141,001Revisable estimate
October 20141,074Revisable estimate
September 20141,023Revisable estimate
August 2014984Revisable estimate
July 20141,085Revisable estimate
June 2014911Revisable estimate
May 20141,007Revisable estimate
April 20141,043Revisable estimate
March 2014970Revisable estimate
February 2014944Revisable estimate
January 2014888Revisable estimate
December 20131,002Revisable estimate
November 20131,100Revisable estimate
October 2013925Revisable estimate
September 2013850Revisable estimate
August 2013917Revisable estimate
July 2013880Revisable estimate
June 2013839Revisable estimate
May 2013930Revisable estimate
April 2013835Revisable estimate
March 20131,010Revisable estimate
February 2013962Revisable estimate
January 2013888Revisable estimate
December 2012976Revisable estimate
November 2012833Revisable estimate
October 2012915Revisable estimate
September 2012847Revisable estimate
August 2012754Revisable estimate
July 2012740Revisable estimate
June 2012757Revisable estimate
May 2012708Revisable estimate
April 2012753Revisable estimate
March 2012695Revisable estimate
February 2012704Revisable estimate
January 2012723Revisable estimate
December 2011694Revisable estimate
November 2011711Revisable estimate
October 2011610Revisable estimate
September 2011650Revisable estimate
August 2011585Revisable estimate
July 2011623Revisable estimate
June 2011608Revisable estimate
May 2011561Revisable estimate
April 2011554Revisable estimate
March 2011600Revisable estimate
February 2011517Revisable estimate
January 2011630Revisable estimate
December 2010539Revisable estimate
November 2010545Revisable estimate
October 2010543Revisable estimate
September 2010594Revisable estimate
August 2010599Revisable estimate
July 2010546Revisable estimate
June 2010536Revisable estimate
May 2010583Revisable estimate
April 2010687Revisable estimate
March 2010636Revisable estimate
February 2010604Revisable estimate
January 2010614Revisable estimate
December 2009581Revisable estimate
November 2009588Revisable estimate
October 2009534Revisable estimate
September 2009585Revisable estimate
August 2009586Revisable estimate
July 2009594Revisable estimate
June 2009585Revisable estimate
May 2009540Revisable estimate
April 2009478Revisable estimate
March 2009505Revisable estimate
February 2009582Revisable estimate
January 2009490Revisable estimate
December 2008560Revisable estimate
November 2008652Revisable estimate
October 2008777Revisable estimate
September 2008820Revisable estimate
August 2008844Revisable estimate
July 2008923Revisable estimate
June 20081,046Revisable estimate
May 2008973Revisable estimate
April 20081,013Revisable estimate
March 20081,005Revisable estimate
February 20081,103Revisable estimate
January 20081,084Revisable estimate
December 20071,037Revisable estimate
November 20071,197Revisable estimate
October 20071,264Revisable estimate
September 20071,183Revisable estimate
August 20071,330Revisable estimate
July 20071,354Revisable estimate
June 20071,448Revisable estimate
May 20071,415Revisable estimate
April 20071,490Revisable estimate
March 20071,495Revisable estimate
February 20071,480Revisable estimate
January 20071,409Revisable estimate
December 20061,649Revisable estimate
November 20061,570Revisable estimate
October 20061,491Revisable estimate
September 20061,720Revisable estimate
August 20061,650Revisable estimate
July 20061,737Revisable estimate
June 20061,802Revisable estimate
May 20061,942Revisable estimate
April 20061,821Revisable estimate
March 20061,969Revisable estimate
February 20062,119Revisable estimate
January 20062,273Revisable estimate
December 20051,994Revisable estimate
November 20052,147Revisable estimate
October 20052,065Revisable estimate
September 20052,151Revisable estimate
August 20052,095Revisable estimate
July 20052,054Revisable estimate
June 20052,068Revisable estimate
May 20052,025Revisable estimate
April 20052,061Revisable estimate
March 20051,864Revisable estimate
February 20052,207Revisable estimate
January 20052,144Revisable estimate
December 20042,042Revisable estimate
November 20041,782Revisable estimate
October 20042,072Revisable estimate
September 20041,905Revisable estimate
August 20042,024Revisable estimate
July 20042,002Revisable estimate
June 20041,828Revisable estimate
May 20041,981Revisable estimate
April 20042,003Revisable estimate
March 20041,998Revisable estimate
February 20041,846Revisable estimate
January 20041,911Revisable estimate
December 20032,057Revisable estimate
November 20032,083Revisable estimate
October 20031,967Revisable estimate
September 20031,939Revisable estimate
August 20031,833Revisable estimate
July 20031,897Revisable estimate
June 20031,867Revisable estimate
May 20031,751Revisable estimate
April 20031,643Revisable estimate
March 20031,726Revisable estimate
February 20031,629Revisable estimate
January 20031,853Revisable estimate
December 20021,788Revisable estimate
November 20021,753Revisable estimate
October 20021,648Revisable estimate
September 20021,804Revisable estimate
August 20021,633Revisable estimate
July 20021,655Revisable estimate
June 20021,717Revisable estimate
May 20021,764Revisable estimate
April 20021,592Revisable estimate
March 20021,642Revisable estimate
February 20021,829Revisable estimate
January 20021,698Revisable estimate
December 20011,568Revisable estimate
November 20011,602Revisable estimate
October 20011,540Revisable estimate
September 20011,562Revisable estimate
August 20011,567Revisable estimate
July 20011,670Revisable estimate
June 20011,636Revisable estimate
May 20011,605Revisable estimate
April 20011,649Revisable estimate
March 20011,590Revisable estimate
February 20011,625Revisable estimate
January 20011,600Revisable estimate
December 20001,532Revisable estimate
November 20001,551Revisable estimate
October 20001,549Revisable estimate
September 20001,507Revisable estimate
August 20001,541Revisable estimate
July 20001,463Revisable estimate
June 20001,559Revisable estimate
May 20001,575Revisable estimate
April 20001,626Revisable estimate
March 20001,604Revisable estimate
February 20001,737Revisable estimate
January 20001,636Revisable estimate
December 19991,708Revisable estimate
November 19991,648Revisable estimate
October 19991,608Revisable estimate
September 19991,635Revisable estimate
August 19991,648Revisable estimate
July 19991,669Revisable estimate
June 19991,559Revisable estimate
May 19991,611Revisable estimate
April 19991,553Revisable estimate
March 19991,710Revisable estimate
February 19991,670Revisable estimate
January 19991,748Revisable estimate
December 19981,792Revisable estimate
November 19981,660Revisable estimate
October 19981,715Revisable estimate
September 19981,582Revisable estimate
August 19981,614Revisable estimate
July 19981,698Revisable estimate
June 19981,641Revisable estimate
May 19981,536Revisable estimate
April 19981,540Revisable estimate
March 19981,567Revisable estimate
February 19981,584Revisable estimate
January 19981,525Revisable estimate
December 19971,566Revisable estimate
November 19971,510Revisable estimate
October 19971,520Revisable estimate
September 19971,546Revisable estimate
August 19971,390Revisable estimate
July 19971,437Revisable estimate
June 19971,494Revisable estimate
May 19971,442Revisable estimate
April 19971,492Revisable estimate
March 19971,457Revisable estimate
February 19971,486Revisable estimate
January 19971,355Revisable estimate
December 19961,370Revisable estimate
November 19961,489Revisable estimate
October 19961,392Revisable estimate
September 19961,475Revisable estimate
August 19961,557Revisable estimate
July 19961,472Revisable estimate
June 19961,467Revisable estimate
May 19961,504Revisable estimate
April 19961,516Revisable estimate
March 19961,424Revisable estimate
February 19961,491Revisable estimate
January 19961,467Revisable estimate
December 19951,431Revisable estimate
November 19951,452Revisable estimate
October 19951,369Revisable estimate
September 19951,369Revisable estimate
August 19951,416Revisable estimate
July 19951,461Revisable estimate
June 19951,281Revisable estimate
May 19951,314Revisable estimate
April 19951,267Revisable estimate
March 19951,249Revisable estimate
February 19951,316Revisable estimate
January 19951,407Revisable estimate
December 19941,455Revisable estimate
November 19941,511Revisable estimate
October 19941,450Revisable estimate
September 19941,474Revisable estimate
August 19941,450Revisable estimate
July 19941,439Revisable estimate
June 19941,409Revisable estimate
May 19941,526Revisable estimate
April 19941,465Revisable estimate
March 19941,564Revisable estimate
February 19941,337Revisable estimate
January 19941,272Revisable estimate
December 19931,533Revisable estimate
November 19931,376Revisable estimate
October 19931,392Revisable estimate
September 19931,343Revisable estimate
August 19931,300Revisable estimate
July 19931,254Revisable estimate
June 19931,280Revisable estimate
May 19931,260Revisable estimate
April 19931,258Revisable estimate
March 19931,083Revisable estimate
February 19931,210Revisable estimate
January 19931,210Revisable estimate
December 19921,227Revisable estimate
November 19921,214Revisable estimate
October 19921,244Revisable estimate
September 19921,186Revisable estimate
August 19921,226Revisable estimate
July 19921,139Revisable estimate
June 19921,145Revisable estimate
May 19921,214Revisable estimate
April 19921,099Revisable estimate
March 19921,297Revisable estimate
February 19921,250Revisable estimate
January 19921,176Revisable estimate
December 19911,079Revisable estimate
November 19911,103Revisable estimate
October 19911,079Revisable estimate
September 19911,015Revisable estimate
August 19911,049Revisable estimate
July 19911,063Revisable estimate
June 19911,036Revisable estimate
May 1991996Revisable estimate
April 19911,001Revisable estimate
March 1991921Revisable estimate
February 1991965Revisable estimate
January 1991798Revisable estimate
December 1990969Revisable estimate
November 19901,145Revisable estimate
October 19901,014Revisable estimate
September 19901,110Revisable estimate
August 19901,115Revisable estimate
July 19901,171Revisable estimate
June 19901,177Revisable estimate
May 19901,212Revisable estimate
April 19901,248Revisable estimate
March 19901,289Revisable estimate
February 19901,437Revisable estimate
January 19901,551Revisable estimate
December 19891,251Revisable estimate
November 19891,351Revisable estimate
October 19891,410Revisable estimate
September 19891,279Revisable estimate
August 19891,332Revisable estimate
July 19891,427Revisable estimate
June 19891,397Revisable estimate
May 19891,331Revisable estimate
April 19891,339Revisable estimate
March 19891,422Revisable estimate
February 19891,425Revisable estimate
January 19891,621Revisable estimate
December 19881,563Revisable estimate
November 19881,569Revisable estimate
October 19881,522Revisable estimate
September 19881,492Revisable estimate
August 19881,493Revisable estimate
July 19881,467Revisable estimate
June 19881,478Revisable estimate
May 19881,421Revisable estimate
April 19881,573Revisable estimate
March 19881,532Revisable estimate
February 19881,473Revisable estimate
January 19881,271Revisable estimate
December 19871,400Revisable estimate
November 19871,656Revisable estimate
October 19871,515Revisable estimate
September 19871,695Revisable estimate
August 19871,605Revisable estimate
July 19871,575Revisable estimate
June 19871,594Revisable estimate
May 19871,628Revisable estimate
April 19871,614Revisable estimate
March 19871,726Revisable estimate
February 19871,784Revisable estimate
January 19871,774Revisable estimate
December 19861,833Revisable estimate
November 19861,623Revisable estimate
October 19861,681Revisable estimate
September 19861,687Revisable estimate
August 19861,807Revisable estimate
July 19861,782Revisable estimate
June 19861,847Revisable estimate
May 19861,854Revisable estimate
April 19861,933Revisable estimate
March 19861,876Revisable estimate
February 19861,848Revisable estimate
January 19861,972Revisable estimate
December 19851,942Revisable estimate
November 19851,698Revisable estimate
October 19851,834Revisable estimate
September 19851,676Revisable estimate
August 19851,743Revisable estimate
July 19851,684Revisable estimate
June 19851,676Revisable estimate
May 19851,680Revisable estimate
April 19851,821Revisable estimate
March 19851,800Revisable estimate
February 19851,632Revisable estimate
January 19851,711Revisable estimate
December 19841,612Revisable estimate
November 19841,689Revisable estimate
October 19841,590Revisable estimate
September 19841,698Revisable estimate
August 19841,586Revisable estimate
July 19841,732Revisable estimate
June 19841,843Revisable estimate
May 19841,774Revisable estimate
April 19841,851Revisable estimate
March 19841,663Revisable estimate
February 19842,260Revisable estimate
January 19841,897Revisable estimate
December 19831,688Revisable estimate
November 19831,785Revisable estimate
October 19831,715Revisable estimate
September 19831,710Revisable estimate
August 19831,910Revisable estimate
July 19831,785Revisable estimate
June 19831,733Revisable estimate
May 19831,776Revisable estimate
April 19831,472Revisable estimate
March 19831,606Revisable estimate
February 19831,699Revisable estimate
January 19831,586Revisable estimate
December 19821,303Revisable estimate
November 19821,372Revisable estimate
October 19821,173Revisable estimate
September 19821,144Revisable estimate
August 19821,046Revisable estimate
July 19821,166Revisable estimate
June 1982902Revisable estimate
May 19821,025Revisable estimate
April 1982917Revisable estimate
March 1982931Revisable estimate
February 1982866Revisable estimate
January 1982843Revisable estimate
December 1981910Revisable estimate
November 1981837Revisable estimate
October 1981873Revisable estimate
September 1981911Revisable estimate
August 1981940Revisable estimate
July 19811,041Revisable estimate
June 19811,045Revisable estimate
May 19811,140Revisable estimate
April 19811,360Revisable estimate
March 19811,306Revisable estimate
February 19811,246Revisable estimate
January 19811,547Revisable estimate
December 19801,482Revisable estimate
November 19801,510Revisable estimate
October 19801,523Revisable estimate
September 19801,471Revisable estimate
August 19801,436Revisable estimate
July 19801,269Revisable estimate
June 19801,196Revisable estimate
May 1980927Revisable estimate
April 19801,051Revisable estimate
March 19801,047Revisable estimate
February 19801,350Revisable estimate
January 19801,341Revisable estimate
December 19791,498Revisable estimate
November 19791,524Revisable estimate
October 19791,681Revisable estimate
September 19791,832Revisable estimate
August 19791,778Revisable estimate
July 19791,760Revisable estimate
June 19791,913Revisable estimate
May 19791,876Revisable estimate
April 19791,748Revisable estimate
March 19791,847Revisable estimate
February 19791,520Revisable estimate
January 19791,630Revisable estimate
December 19782,044Revisable estimate
November 19782,094Revisable estimate
October 19781,981Revisable estimate
September 19781,970Revisable estimate
August 19781,996Revisable estimate
July 19782,092Revisable estimate
June 19782,070Revisable estimate
May 19782,075Revisable estimate
April 19782,197Revisable estimate
March 19782,032Revisable estimate
February 19781,738Revisable estimate
January 19781,718Revisable estimate
December 19772,142Revisable estimate
November 19772,042Revisable estimate
October 19772,042Revisable estimate
September 19771,949Revisable estimate
August 19772,020Revisable estimate
July 19772,058Revisable estimate
June 19771,893Revisable estimate
May 19771,971Revisable estimate
April 19771,892Revisable estimate
March 19772,063Revisable estimate
February 19771,943Revisable estimate
January 19771,527Revisable estimate
December 19761,804Revisable estimate
November 19761,641Revisable estimate
October 19761,629Revisable estimate
September 19761,720Revisable estimate
August 19761,550Revisable estimate
July 19761,401Revisable estimate
June 19761,495Revisable estimate
May 19761,459Revisable estimate
April 19761,395Revisable estimate
March 19761,421Revisable estimate
February 19761,538Revisable estimate
January 19761,367Revisable estimate
December 19751,321Revisable estimate
November 19751,360Revisable estimate
October 19751,344Revisable estimate
September 19751,264Revisable estimate
August 19751,260Revisable estimate
July 19751,226Revisable estimate
June 19751,087Revisable estimate
May 19751,121Revisable estimate
April 19751,005Revisable estimate
March 1975993Revisable estimate
February 1975904Revisable estimate
January 19751,032Revisable estimate
December 1974975Revisable estimate
November 19741,026Revisable estimate
October 19741,070Revisable estimate
September 19741,150Revisable estimate
August 19741,142Revisable estimate
July 19741,316Revisable estimate
June 19741,513Revisable estimate
May 19741,426Revisable estimate
April 19741,607Revisable estimate
March 19741,555Revisable estimate
February 19741,752Revisable estimate
January 19741,451Revisable estimate
December 19731,526Revisable estimate
November 19731,724Revisable estimate
October 19731,677Revisable estimate
September 19731,874Revisable estimate
August 19732,051Revisable estimate
July 19732,123Revisable estimate
June 19732,067Revisable estimate
May 19732,266Revisable estimate
April 19732,084Revisable estimate
March 19732,365Revisable estimate
February 19732,289Revisable estimate
January 19732,481Revisable estimate
December 19722,366Revisable estimate
November 19722,421Revisable estimate
October 19722,485Revisable estimate
September 19722,481Revisable estimate
August 19722,382Revisable estimate
July 19722,252Revisable estimate
June 19722,254Revisable estimate
May 19722,221Revisable estimate
April 19722,249Revisable estimate
March 19722,334Revisable estimate
February 19722,390Revisable estimate
January 19722,494Revisable estimate
December 19712,295Revisable estimate
November 19712,182Revisable estimate
October 19712,128Revisable estimate
September 19712,041Revisable estimate
August 19712,158Revisable estimate
July 19712,083Revisable estimate
June 19712,026Revisable estimate
May 19712,049Revisable estimate
April 19711,986Revisable estimate
March 19711,910Revisable estimate
February 19711,741Revisable estimate
January 19711,828Revisable estimate
December 19701,893Revisable estimate
November 19701,647Revisable estimate
October 19701,580Revisable estimate
September 19701,534Revisable estimate
August 19701,399Revisable estimate
July 19701,517Revisable estimate
June 19701,385Revisable estimate
May 19701,290Revisable estimate
April 19701,264Revisable estimate
March 19701,319Revisable estimate
February 19701,305Revisable estimate
January 19701,085Revisable estimate
December 19691,327Revisable estimate
November 19691,229Revisable estimate
October 19691,381Revisable estimate
September 19691,507Revisable estimate
August 19691,358Revisable estimate
July 19691,368Revisable estimate
June 19691,528Revisable estimate
May 19691,583Revisable estimate
April 19691,524Revisable estimate
March 19691,561Revisable estimate
February 19691,705Revisable estimate
January 19691,769Revisable estimate
December 19681,548Revisable estimate
November 19681,630Revisable estimate
October 19681,569Revisable estimate
September 19681,556Revisable estimate
August 19681,495Revisable estimate
July 19681,512Revisable estimate
June 19681,405Revisable estimate
May 19681,408Revisable estimate
April 19681,554Revisable estimate
March 19681,466Revisable estimate
February 19681,520Revisable estimate
January 19681,380Revisable estimate
December 19671,308Revisable estimate
November 19671,538Revisable estimate
October 19671,491Revisable estimate
September 19671,421Revisable estimate
August 19671,407Revisable estimate
July 19671,364Revisable estimate
June 19671,248Revisable estimate
May 19671,304Revisable estimate
April 19671,091Revisable estimate
March 19671,056Revisable estimate
February 19671,123Revisable estimate
January 19671,067Revisable estimate
December 1966990Revisable estimate
November 1966961Revisable estimate
October 1966843Revisable estimate
September 19661,046Revisable estimate
August 19661,119Revisable estimate
July 19661,086Revisable estimate
June 19661,194Revisable estimate
May 19661,265Revisable estimate
April 19661,352Revisable estimate
March 19661,394Revisable estimate
February 19661,378Revisable estimate
January 19661,370Revisable estimate
December 19651,656Revisable estimate
November 19651,460Revisable estimate
October 19651,452Revisable estimate
September 19651,482Revisable estimate
August 19651,432Revisable estimate
July 19651,529Revisable estimate
June 19651,488Revisable estimate
May 19651,478Revisable estimate
April 19651,438Revisable estimate
March 19651,423Revisable estimate
February 19651,433Revisable estimate
January 19651,361Revisable estimate
December 19641,484Revisable estimate
November 19641,486Revisable estimate
October 19641,524Revisable estimate
September 19641,455Revisable estimate
August 19641,569Revisable estimate
July 19641,562Revisable estimate
June 19641,550Revisable estimate
May 19641,467Revisable estimate
April 19641,448Revisable estimate
March 19641,517Revisable estimate
February 19641,820Revisable estimate
January 19641,603Revisable estimate
December 19631,491Revisable estimate
November 19631,622Revisable estimate
October 19631,779Revisable estimate
September 19631,763Revisable estimate
August 19631,639Revisable estimate
July 19631,614Revisable estimate
June 19631,588Revisable estimate
May 19631,641Revisable estimate
April 19631,689Revisable estimate
March 19631,534Revisable estimate
February 19631,456Revisable estimate
January 19631,244Revisable estimate
December 19621,564Revisable estimate
November 19621,622Revisable estimate
October 19621,533Revisable estimate
September 19621,324Revisable estimate
August 19621,517Revisable estimate
July 19621,450Revisable estimate
June 19621,404Revisable estimate
May 19621,483Revisable estimate
April 19621,524Revisable estimate
March 19621,443Revisable estimate
February 19621,278Revisable estimate
January 19621,361Revisable estimate
December 19611,365Revisable estimate
November 19611,385Revisable estimate
October 19611,415Revisable estimate
September 19611,429Revisable estimate
August 19611,312Revisable estimate
July 19611,335Revisable estimate
June 19611,382Revisable estimate
May 19611,228Revisable estimate
April 19611,166Revisable estimate
March 19611,312Revisable estimate
February 19611,226Revisable estimate
January 19611,183Revisable estimate
December 19601,063Revisable estimate
November 19601,246Revisable estimate
October 19601,246Revisable estimate
September 19601,097Revisable estimate
August 19601,344Revisable estimate
July 19601,197Revisable estimate
June 19601,247Revisable estimate
May 19601,271Revisable estimate
April 19601,289Revisable estimate
March 19601,109Revisable estimate
February 19601,503Revisable estimate
January 19601,460Revisable estimate
December 19591,601Revisable estimate
November 19591,416Revisable estimate
October 19591,355Revisable estimate
September 19591,540Revisable estimate
August 19591,430Revisable estimate
July 19591,547Revisable estimate
June 19591,503Revisable estimate
May 19591,498Revisable estimate
April 19591,590Revisable estimate
March 19591,620Revisable estimate
February 19591,667Revisable estimate
January 19591,657Revisable estimate

Reading the latest movement

In September 2026, housing starts were 1,221 thousand units at an annual rate, down 67 from August 2026 and down 98 from September 2025. Across 813 readings since January 1959, the average is 1,430 thousand units at an annual rate, and the latest reading is higher than 25% of them. The average since January 2017 is 1,380 thousand units at an annual rate.

A difference between periods describes economic change in this edition of the data; a later revision of either observation is a separate event.

What the housing starts tells you

Housing starts count new privately owned housing units on which construction began during the month, reported as a seasonally adjusted annual rate.

Housing starts are a direct measure of new residential construction activity, which feeds into residential investment in GDP and drives demand for lumber, appliances, furnishings and construction labor. Because housing is especially sensitive to mortgage rates, starts are one of the clearest channels through which monetary policy affects the real economy, and economists watch them for early signs of turning points.

Homebuilders, building-product suppliers, lenders and local planners use starts to assess market conditions and to judge whether the country is adding enough housing. Analysts tracking housing shortages compare starts over time with household formation, and the split between single-family and multifamily starts helps distinguish trends in owner-occupied housing from rental supply. Starts also feed directly into estimates of residential investment, so they influence quarterly GDP projections.

How to read it

  • Separate single-family from multifamily (structures with five or more units). Multifamily starts are lumpy because a single large project can add hundreds of units in one month.
  • Monthly changes often fall within the sampling error. Census reports confidence intervals, and many monthly moves are not statistically significant; use three-month averages or year-over-year comparisons.
  • The annual rate shows the pace if that month's activity continued for a year. Unadjusted monthly counts are much smaller and have strong seasonal patterns.
  • Regional data (Northeast, Midwest, South, West) can reveal weather effects, since cold or wet months suppress starts in some regions and are later reversed.

What moves it

Mortgage rates and builders' financing costs are the strongest short-run drivers, since they determine affordability for buyers and the viability of new projects. Demand depends on job growth, household formation, migration and the supply of existing homes for sale. Builder costs for land, labor and materials influence how many projects go ahead. Apartment construction responds to rents, vacancy rates and investor appetite. Weather, natural disasters and local zoning or permitting changes cause short-term swings.

Records and long-run averages

Computed from every published monthly reading (thousands of housing units, annual rate) in this edition, January 1959 to September 2026. Records reflect the acquired history only; earlier data published elsewhere is not included.

Housing Starts: records and averages, published level
MeasureValueWhen / basis
Latest1,221September 2026
Record high2,494January 1972
Record low478April 2009
Long-run average1,430Median 1,448 · January 1959 onward
Average since 20171,380Last ten calendar years
Latest percentile25thShare of readings below the latest

Year-by-year summary

Calendar-year average, range and final reading of the published level (thousands of housing units, annual rate). A year marked partial includes only the months published so far.

Housing starts: published level by calendar year
YearAverageLowHighLast reading
2026 partial1,3521,1821,5221,221 September 2026
20251,3561,2731,4911,378 December 2025
20241,3701,2691,5551,494 December 2024
20231,4211,3211,6091,504 December 2023
20221,5501,2961,8071,296 December 2022
20211,6031,3981,7111,711 December 2021
20201,3949361,6141,614 December 2020
20191,2921,1211,5481,548 December 2019
20181,2471,0951,3571,095 December 2018
20171,2051,1461,2731,177 December 2017
20161,1771,0681,3131,252 December 2016
20151,1078861,2241,146 December 2015

Readings around recent recessions

Values of the published level at each NBER business-cycle peak and trough inside this history, with the range from the peak through twelve months after the trough. Shaded bands on the chart mark the same NBER recession dates.

Housing starts: readings around NBER recessions
Recession (peak to trough)At peakAt troughLow in windowHigh in window
February 2020 to April 20201,549936936 April 20201,688 March 2021
December 2007 to June 20091,037585478 April 20091,103 February 2008
March 2001 to November 20011,5901,6021,540 October 20011,829 February 2002
July 1990 to March 19911,171921798 January 19911,297 March 1992

Recession dates: NBER Business Cycle Dating Committee. A reading at a peak or trough month is not a forecast signal on its own.

Put the latest level in context

These comparisons use published levels in this snapshot, with matching reference periods. Rate differences use percentage points; growth of a rate is not a percentage-point difference. The chart above may use a different transformation.

Housing starts: same-period historical comparisons · Thousands of housing units, annual rate
Earlier periodEarlier levelLatest levelAbsolute differenceRelative change
September 20251,3191,221-98-7.43%
September 20211,5761,221-355-22.53%
September 20161,0681,22115314.33%

How have prices, jobs and output changed since 2019? · Research questions and worked comparisons.

Definition and limitations

Counts housing units, not buildings. The annual rate describes the monthly pace; it is not actual units built that month. Permits, starts and completions are different stages and do not track one fixed cohort. Monthly estimates have sampling uncertainty and are revised.

Percentage growth is calculated from matching series levels. Both endpoints retain the same adjustment basis. Growth computed from rounded source inputs can differ from the agency’s published headline rounding.

Which measure fits your question? Compare definitions and complementary measures before drawing a conclusion.

Release schedule and revisions

The Census Bureau and the Department of Housing and Urban Development jointly publish housing starts in the monthly New Residential Construction release, typically around the 12th business day of the following month. Estimates come from the Survey of Construction. Each release revises the previous months, and annual revisions update seasonal factors.

See the producer's release page for the next publication.

Read it alongside

  • Housing building permits: Permits usually precede starts, so they help anticipate where starts are heading in coming months.
  • Housing completions: Completions show how much of the construction pipeline is turning into finished units ready for occupancy.
  • 10-year Treasury yield: Mortgage rates broadly track the 10-year Treasury yield, the main financial influence on housing demand.

Frequently asked questions

When is a house counted as started?

Census counts a start when excavation begins for the footings or foundation of a residential building. For apartment buildings, all units in the building are counted as started at the same time. Renovations, additions and manufactured (mobile) homes are not counted as housing starts.

Why are housing starts reported at an annual rate?

Monthly seasonally adjusted counts are multiplied by 12 to show the yearly pace implied by that month. This makes months comparable with each other and with annual totals, despite seasonal swings in construction. It does not mean that number of units were started in that single month; the actual monthly count is about one-twelfth of the rate.

Why do housing starts and building permits not match?

Permits and starts measure different stages and cover slightly different areas. Starts include homes built in places that do not require permits, while some permitted projects begin months later or are never started. Timing differences mean a given month's permits and starts reflect different groups of projects.

Transformations

The published level keeps the source unit. Year-over-year change compares with the same period a year earlier (52 weeks for weekly data); previous-period change compares with the preceding observation, in percentage points when the series is already a rate. No frequency conversion, interpolation or hidden rescaling is applied. Formulas and methods.

Source and methodology

Producer documentation · Acquisition endpoint / file · Producer release information

Revisions and archived snapshots

Earlier site acquisitions are archived. Matching unchanged series identities can be compared between versions; this is not a complete agency vintage history. Previous-period readings above come from the same acquired snapshot. The revision comparison separates changes to matching historical observations from new coverage and corrected series identities. Earlier agency vintages remain outside this archive. Read the revision policy and download this frozen snapshot.

What can we help you find?

Type at least two letters to start searching.

Browse economic guides Esc to close